Research confirms that PMIS can be an important tool to improve project managers effeciency and effectivenes. Organizations that do not have a PMIS for managing their construction program should seriously consider one. But, becareful with selecting the right one. Research also confirms that selecting the wrong one can have the opposite effect on your construction program and project managers besides being a waste of money.
".......the result of this research show that the use of project management information system is in fact advantageous to project managers. Improvements in effectiveness and efficiency in managerial tasks were obseverd here in terms ofbetter project planning, scheduling, monitoring, and control. Improvements in productivity were also observed in terms of timelier decision-making. Advantages obtained from PMIS use are not limited to individual performance but also include project performance. These systems were found to have direct impacts on project success, as they constribute to improving budget control and meeting project deadlines as well as fullfilling techincal specificatons. One can therefore conclude that PMIS make a significant contribution to project success and should continue tobe the object of project managment research."
Louis Raymond, Fracois ergeron, International Journal of Project Management, June 7, 2007.
Purpose of this blog is to collaborate with other Owners that manage construction programs and share best practices.
Sunday, November 20, 2011
Monday, November 14, 2011
Crate & Barrel Reduces Construction Cost with OPMIS
At the COAA National Conference in Las Vegas, John Moebes of Crate & Barrel did a fantatsic job with showing us how Crate & Barrel has reduced their construction "Transaction Costs" by using their Owner's PMIS and BIM. Projectmate is the software that Crate & Barrel uses for centralizing all their program management information. It was great to hear how they have been able to reduce their construction cost and that the retail industry also believes that mandating the use of an Owner's PMIS is the most effective way to manage their construction program. The link to the Crate & Barrel OPMIS presentation portion is listed below.
COAA National Conference-Nov. 2011
COAA National Conference in Las Vegas was fantastic. Sam Neider and I presented on how important it is for the Owner to take charge of the BIM process if the Owner wants to maximize the benefits of using BIM. Also covered how BIM collaboration can be improved by centralizing all the model files in the Owner's PMIS (OPMIS). The link to the presentation is below.
Monday, November 7, 2011
Architect Transmitting Drawings via OPMIS
Here is a good example how we have centralized the issuance of all the contstruction documents via our OPMIS. The architect uploads the construction documents to the appropriate folders and then creates a Work Flow Form to send the drawings to the contractor. All the key individuals receive a copy of the notice. The contractor then acknowledges receipt of the drawings and uses the form to create a change order if the revised construction documents require one. When a change order is issued through our process, all the supporting documents are linked including this A/E: Document Issue form which allow us to quickly have access to all corresponding back up that explains the change order. This is also a good example how the notice looks and is transmitted via e-mail to everyone.
Sunday, November 6, 2011
OPMIS Usage at UTSW
I am sharing the the following report which indicates our current use of our OPMIS. As you will notice, there are several modules we are using extensively and others we are not using at all. All organizations are different so it is very important to for the OPMIS is to be flexible to meet the needs of the institution. During implementation, we started only with the Cost, Contact and Forms Modules. After a year of using it, we started using the Process Module and Submittal Modules. Schedule Modules are being used for documeting milestones and creating cashflows. The following link provides access to the report in a pdf format if you would like to print.
UTSW OPMIS Usage Report
UTSW OPMIS Usage Report